Publications
Aviation Applications
- M. S. Akturk, A. Atamturk and S. Gurel, `Aircraft rescheduling with cruise speed control', Operations Research, 62 (4), 829-845, 2014.
- A. S. Duran, S. Gurel and M. S. Akturk,
`Robust airline scheduling with controllable cruise times and chance
constraints', IIE Transactions, 47 (1), 64-83, 2015.
- U. Arikan, S. Gurel and M. S. Akturk,
`Integrated aircraft and passenger recovery with cruise time
controllability', Annals of Operations Research, 236 (2), 295-317, 2016.
- H. Gurkan, S. Gurel and M. S. Akturk,
“An integrated approach for airline scheduling, aircraft fleeting
and routing with cruise speed control”,
Transportation Research Part C: Emerging Technologies, 68, 38-57, 2016.
- U. Arikan, S. Gurel and M. S. Akturk,
`Flight network-based approach for integrated airline recovery with cruise speed control', Transportation Science, Vol. 51, pp. 1259-1287, 2017.
- O. Safak, S. Gurel and M. S. Akturk, 'Integrated aircraft-path assignment and robust schedule design with cruise speed control', Computers and Operations Research, Vol. 84, pp. 127-145, 2017.
- O. Safak, O. Cavus and M. S. Akturk, 'Multi-stage airline scheduling problem with stochastic passenger demand and non-cruise times', Transportation Research Part B: Methodological, Vol. 114, pp. 39-67, 2018.
- O. Safak, A. Atamturk and M. S. Akturk,
'Accommodating new flights into an existing airline flight schedule' Transportation Research Part C: Emerging Technologies, Vol. 104, pp. 265-286, 2019.
- Y. N. Yetimoglu and M. S. Akturk, 'Aircraft and passenger recovery during an aircraft’s unexpected availability', Journal of Air Transport Management, Vol. 91, Article 101991, 2021.
- O. Safak, O. Cavus and M. S. Akturk, 'A two-stage decision dependent stochastic approach for airline flight network expansion', Transportation Research Part B: Methodological, Vol. 158, pp. 78-101, 2022.
- D. Simsek and M. S. Akturk, 'Resilient airline scheduling to minimize delay risks', Transportation Research Part C: Emerging Technologies, Vol. 141, Article 103734, 2022.
Production Management Systems
- E. Korpeoglu, H. Yaman and M. S. Akturk, `A multi-stage stochastic programming approach in master production scheduling', European Journal of Operational Research, 213 (1), 166-179, 2011.
- E. Koca, H. Yaman and M. S. Akturk,
`Lot-sizing with piecewise concave production costs`, INFORMS Journal on Computing, 26 (4), 767-779, 2014.
- E. Koca, H. Yaman and M. S. Akturk,
`Stochastic lot-sizing with controllable processing times`,
OMEGA, 53, 1-10, 2015.
-
I. Mahmutogullari, O. Cavus and M. S. Akturk, 'Bounds on risk-averse mixed-integer multi-stage stochastic problems with mean-CVAR', European Journal of Operational Research, Vol. 266, pp. 595-608, 2018.
- E. Koca, H. Yaman and M. S. Akturk, 'Stochastic lot sizing problem with nervousness considerations', Computers & Operations Research, Vol. 94, pp. 23-37, 2018.
- I. Mahmutogullari, O. Cavus and M. S. Akturk,
'An exact solution approach for multi-stage risk-averse mixed-integer problems ', to appear in Annals of Operations Research.
- I. Mahmutogullari, S. Ahmed, O. Cavus and M. S. Akturk, 'The value of multi-stage stochastic programming in risk-averse unit commitment problems', IEEE Transactions on Power Systems, Vol. 34, Issue 5, pp. 3667-3676, 2019.
|
Group Technology and Cellular Manufacturing Systems
- M. S. Akturk and O. Daglioglugil,
"Dynamic Lot-Sizing and Scheduling in Cellular Manufacturing Systems Using Hybrid Simulation/Analytic Model," International Journal of Industrial Engineering, 2 (4), 251-260, 1995.
- M. S. Akturk and O. Balkose, "Part-Machine Grouping Using a Multi-Objective Cluster Analysis," International Journal of Production Research, 34 (8), 2299-2315, 1996.
(pdf file)
- M. S. Akturk and G. R. Wilson, "A Hierarchical Model for Cell Loading Problem of
Cellular Manufacturing Systems," International
Journal of Production Research, 36 (7), 2005-2023, 1998.
(pdf file)
- M. S. Akturk, "Note on the Within-Cell Layout Problem based on Operation Sequences," Production Planning and Control, 7 (1), 99-103, 1996.
(pdf file)
-
M. Selim Akturk and A. Turkcan, "Cellular Manufacturing System Design Using a Holonistic
Approach", International Journal of Production Research,
38 (10), 2327-2347, 2000.
(pdf file)
- M. S. Akturk and H. M. Yayla, ``Management of Product
Variety in Cellular Manufacturing Systems'',
International Journal of Flexible Manufacturing Systems,
Special Issue on Virtual and Non-traditional Manufacturing Cells,
17 (2), 93-117, 2005.
(pdf file)
- M. S. Akturk, `Joint cell loading and scheduling approach to cellular manufacturing systems', International
Journal of Production Research, Vol. 49, No. 21, pp. 6321-6341, 2011.
|
Flexible Manufacturing Systems
- M. S. Akturk and S. Avci, "Integrated Process Planning Approach to CNC Machine Tools," International Journal of Advanced Manufacturing Technology, 12 (3), 221-229, 1996.
(pdf file)
- M. S. Akturk and S. Avci, "Tool Allocation and Machining Conditions Optimization for CNC Machines," European Journal of Operational Research, 94 (2), 335-348, 1996.
(pdf file)
- S. Avci and M. S. Akturk, "Tool Magazine Arrangement and Operations Sequencing on CNC Machines,"
Computers and Operations Research, 23 (11), 1069-1081, 1996.
(pdf file)
- M. S. Akturk, "An Exact Tool Allocation Approach for
CNC Machines", International Journal of Computer
Integrated Manufacturing, 12 (2), 129-140, 1999.
(pdf file)
- M. S. Akturk and S. Onen, "Joint Lot Sizing and Tool Management in a CNC Environment",
Computers in Industry, 40 (1), 63-77, 1999.
(pdf file)
- M. S. Akturk and S. Onen, "Dynamic Lot Sizing and Tool
Management in Automated Manufacturing Systems",
Computers & Operations Research, 29 (8), 1059-1079, 2002.
(pdf file)
- M. S. Akturk and S. Ozkan, "Integrated Scheduling and
Tool Management in Flexible Manufacturing Systems",
International
Journal of Production Research, 39 (12), 2697-2722, 2001.
(pdf file)
- M. S. Akturk, J. B. Ghosh and E. D. Gunes,
``Scheduling with Tool Changes to Minimize Total Completion Time: A
Study of Heuristics and Their Performance",
Naval Research Logistics, 50 (1), 15-30, 2003.
(pdf file)
- A. Turkcan, M. S. Akturk and R. H. Storer,
``Nonidentical Parallel CNC Machine Scheduling",
International Journal of Production Research,
41 (10), 2143-2168, 2003.
(pdf file)
- M. S. Akturk, J. B. Ghosh and E. D. Gunes,
``Scheduling with Tool Changes to Minimize Total Completion Time:
Basic Results and SPT Performance",
European Journal of Operational Research, 157 (3), 784-790, 2004.
(pdf file)
- M. S. Akturk and S. Gurel, ``Machining Conditions
Based Preventive Maintenance", International Journal of
Production Research, 45 (8), 1725-1743, 2007.
(pdf file)
- S. Gurel and M. S. Akturk,
``Scheduling preventive maintenance on a single CNC machine",
International Journal of Production Research, 46 (24), 6797-6821, 2008.
(pdf file)
|
Scheduling with Controllable Processing Times
- R. K. Kayan and M. S. Akturk, ``A New Bounding
Mechanism for the CNC Machine Scheduling Problems with Controllable
Processing Times", European Journal of Operational
Research Feature Issue on Multicriteria Scheduling,
167 (3), 624-643, 2005.
(pdf file)
- M. S. Akturk, J. B. Ghosh and R. K. Kayan,
``Scheduling With Tool Changes to Minimize Total Completion Time
Under Controllable Machining Conditions",
Computers & Operations Research,
34 (7), 2130-2146, 2007.
(pdf file)
- S. Gurel and M. S. Akturk,
``Considering manufacturing cost and scheduling performance on a CNC turning
machine", European Journal of Operational Research, 177 (1), 325-343, 2007.
(pdf file)
- A. Turkcan, M. S. Akturk and R. H. Storer,
``Due date and cost-based FMS loading, scheduling and tool
management", International Journal of Production Research,
45 (5), 1183-1213, 2007.
(pdf file)
- S. Gurel and M. S. Akturk,
``Scheduling parallel CNC machines with time/cost trade-off considerations",
Computers & Operations Research,
34 (9), 2774-2789, 2007.
(pdf file)
- S. Gurel and M. S. Akturk,
``Optimal allocation and processing time decisions on non-identical parallel
CNC machines: epsilon-constraint approach",
European Journal of Operational Research, 183 (2), 591-607, 2007.
(pdf file)
- M. O. Atan and M. S. Akturk, ``Single CNC machine
scheduling with controllable processing times and multiple due
dates", International Journal of Production Research, 46 (21), 6087-6111, 2008.
(pdf file)
- M. S. Akturk, A. Atamturk and S. Gurel,
``A strong conic quadratic reformulation for machine-job assignment
with controllable processing times", Operations Research Letters, 37 (3), 187-191, 2009.
(pdf file)
A. Turkcan, M. S. Akturk and R. H. Storer,
``Predictive/reactive scheduling with controllable processing times
and earliness-tardiness penalties", IIE Transactions,
41 (12), 1080-1095, 2009.
(pdf file)
M. S. Akturk, A. Atamturk and S. Gurel,
``Parallel machine match-up scheduling with manufacturing cost
considerations", Journal of Scheduling, 13 (1),
95-110, 2010.
(pdf file)
S. Gurel, E. Korpeoglu and M. S. Akturk,
``An anticipative scheduling approach with controllable processing
times", Computers & Operations Research, 37 (6), 1002-1013, 2010.
- M. S. Akturk and T. Ilhan, `Single CNC machine scheduling with controllable processing times to minimize total weighted tardiness', Computers & Operations Research, 38 (4), 771-781, 2011.
- Z. Uruk, H. Gultekin and M. S. Akturk,
`Two-machine flowshop scheduling with flexible operations and
controllable processing times`, Computers & Operations
Research, Vol. 40, No. 2, pp. 639-653, 2013.
|
Production Scheduling
- M. S. Akturk and H. Yilmaz, "Scheduling of Automated Guided Vehicles in a Decision Making Hierarchy," International Journal of Production Research, 34 (2), 577-591, 1996.
(pdf file)
- M. S. Akturk and E. Gorgulu, "Match-up Scheduling Under a Machine Breakdown",
European Journal of Operational Research, 112 (1), 81-97, 1999.
(pdf file)
- M. S. Akturk and M. B. Yildirim, "A New Lower Bounding Scheme for the Total Weighted Tardiness Problem",
Computers and Operations Research, 25 (4), 265-278, 1998.
(pdf file)
- M. S. Akturk and M. B. Yildirim, "A New Dominance Rule for the Total Weighted Tardiness Problem",
Production Planning & Control, 10 (2), 138-149, 1999.
(pdf file)
- M. S. Akturk and K. Kilic, "Generating
Short-Term Observation Schedules for Space Mission Projects",
Journal of Intelligent Manufacturing, 10 (5), 387-404, 1999.
(pdf file)
- M. S. Akturk and D. Ozdemir, "An Exact Approach to
Minimizing Total Weighted Tardiness with Release Dates",
IIE Transactions, 32 (11), 1091-1101, 2000.
(pdf file)
- M. S. Akturk and D. Ozdemir, "A New Dominance Rule to
Minimize Total Weighted Tardiness with Unequal Release Dates",
European Journal of Operational Research, 135 (2), 394-412, 2001.
(pdf file)
- A. Turkcan and M. S. Akturk, "A Problem Space Genetic
Algorithm in Multiobjective Optimization",
Journal of Intelligent Manufacturing, 14 (3-4), 363-378, 2003.
(pdf file)
- S. Avci, M. S. Akturk and R. H. Storer,
"A Problem Space Algorithm for Single Machine Weighted Tardiness
Problems", IIE Transactions, 35 (5), 479-486, 2003.
(pdf file)
|
Robotic Cell Scheduling
-
M. S. Akturk, H. Gultekin and O. Karasan,
"Robotic Cell Scheduling with Operational Flexibility",
Discrete Applied Mathematics, 145 (3), 334-348, 2005.
(pdf file)
-
H. Gultekin, M. S. Akturk and O. Karasan,
"Cyclic Scheduling of a 2-Machine Robotic Cell with Tooling Constraints",
European Journal of Operational Research, 174 (2), 777-796, 2006.
(pdf file)
-
H. Gultekin, M. S. Akturk and O. Karasan,
"Scheduling in a Three-Machine Robotic Flexible Manufacturing Cell",
Computers & Operations Research,
34 (8), 2463-2477, 2007.
(pdf file)
-
H. Gultekin, M. S. Akturk and O. Karasan,
"Scheduling in Robotic Cells: Process Flexibility and Cell Layout",
International Journal of Production Research,
46 (8), 2105-2121, 2008.
(pdf file)
-
H. Gultekin, M. S. Akturk and O. Karasan,
"Bicriteria Robotic Cell Scheduling",
Journal of Scheduling, 11 (6), 457-473, 2008.
(pdf file)
-
H. Gultekin, O. Karasan and M. S. Akturk,
"Pure cycles in flexible robotic cells", Computers & Operations Research, 36 (2), 329-344, 2009.
(pdf file)
-
H. Gultekin, M. S. Akturk and O. Karasan, "Bicriteria
robotic operation allocation in a flexible manufacturing cell", Computers & Operations Research, 37 (4), 779-789, 2010.
(pdf file)
-
S. Yildiz, M. S. Akturk and O.E. Karasan,
`Bicriteria robotic cell scheduling with controllable processing times", International Journal of Production Research, 49 (2), 569-583, 2011.
- S. Yildiz, O.E. Karasan and M. S. Akturk,
`An analysis of cyclic scheduling problems in robot centered
cells', Computers & Operations Research, Vol. 39, No. 6, pp.
1290-1299, 2012.
-
G. D. Batur, O. E. Karasan and M. S. Akturk, `Multiple part-type scheduling in flexible robotic cells`, International Journal of Production Economics, Vol. 135, No. 2, pp. 726-740, 2012.
-
H. Gultekin, A. Tula and M. S. Akturk, `Automated robotic assembly line design with unavailability periods and tool changes', European Journal of Industrial Engineering, Vol. 10, No. 4, pp. 499-526, 2016.
-
H. Gultekin, O. Dalgic and M. S. Akturk, `Pure cycles in two-machine dual gripper robotic cells', Robotics and Computer Integrated Manufacturing, Vol. 48, pp. 121-131, 2017.
|
Just-in-Time and Kanban Systems
- M. S. Akturk and F. Erhun, "An Overview of Design and Operational Issues of Kanban Systems",
International Journal of Production Research, 37 (17),
3859-3881, 1999. (pdf file)
- F. Erhun, M. S. Akturk and A. Turkcan,
"Interaction of Design and Operational Parameters in Periodic
Review Kanban Systems",
International Journal of Production Research, 41 (14), 3315-3338, 2003.
(pdf file)
- M. S. Akturk and I. Durusoy, "Joint Economic Lot-Sizing Approach to the Just-in-Time Purchasing Problem",
Transactions on Operational Research, 8 (2), 77-95, 1996.
|
Courses Taught
Bilkent University
- IE 376 (Former IE 473), Production Information Systems
- IE 463 Operations Scheduling
- IE 262, Manufacturing Processes
- IE 477, Production Systems Design - Synthesis
- IE 478, Production Systems Design - Practice
- IE 496, Seminar in Production Systems
- IE 371, Operations Analysis and Design
- IE 322, Stochastic Models
- IE 400, Principles of Engineering Management
- IE 561, Manufacturing Systems
- IE 573, Theory of Machine Scheduling
- GE 401-402, Innovative Product Design and Development
Lehigh University
- MSE 433 Technology of the Factory of Future
- IE 222 Operations Research - Deterministic Models
McGill University
Send your suggestions and comments to
M. Selim Akturk
akturk@bilkent.edu.tr
| |